Adam Wilson Ltd.

Time Lapse Films and Photography for the Construction Industry

    home       time lapse      construction        architecture       survey       portraits       contact

 
 

Made in 2006. This short film shows the strand jacking of the enormous  O2 Arena roof. Recorded over a period of 4 weeks mainly at night with the cameras suspended from the gantry walkway which hangs from the great fabric roof of the Millennium Dome, London.

ADAM WILSON PHOTOGRAPHER - CONSTRUCTION PHOTOGRAPHY - CONSTRUCTION PROGRESS - TIME LAPSE - UK - EUROPE- WORLDWIDE

TIME-LAPSE PHOTOGRAPHY UK

O2_Arena,_London..html
kierbeck.html
Woolwich_Arsenal_Crossrail_Station_Box..html

Time lapse film showing the construction of the station box at Woolwich Arsenal, London. Filmed over 16 months with 5 Nikon time lapse cameras, which recorded over 1.5 million time lapse images between them.

Time lapse film showing the strand jacking of the cable net and gantry structure which supports the light towers and fabric roof of the London 2012 Olympic Stadium.

2012_London_Olympic_Stadium_-_Compression_Truss_Lift_No.6.html

The installation of the compression trusses at the 2012 London Olympic Stadium was worthy of several time lapse films. This one shows the installation of truss number 6.

Filmed over 5 weeks with 5 cameras the light tower lifts at the 2012 London Olympic Stadium has been shown on Danish DR1 and worldwide on Discovery Channel.

It shows how flexible the cameras can be. Either mounted on the top of the 1000 tonne crane to give a drivers eye view or at ground level for a dramatic close up of the super lift gliding past.

This film details the manufacture of diaphragm walling reinforcement cages for Kierbeck, London and the installation of a cage with a glass fibre reinforced aperture which will be cut out by the TBM when it breaks into the station box.

2012_London_Olympic_Stadium_-_Compression_truss_Lift_No.1_%26_2.html

The time lapse sequence of the installation of compression trusses 1 and 2 was filmed over a period of two days.

The film shows the giant 1500 tonne crawler crane and the early construction stage of the main stadium for the London Olympic Games.

2012_London_Olympic_Stadium_-_Cable_Net_Lift..html
2012_London_Olympic_Stadium_-_Light_Tower_Lifts..html